Extra Operations

Full Notch

This process removes one quarter of the post entirely. Note:This is a per part number operation, add as many as needed.

End Trim

This operation cuts the leg down by removing inches from the shank to adjust the overall height of the post. Determined by customer. Note:This is a per part number operation, add as many as needed.

Hanger Bolt

5/16" hanger bolt installed in the top center of the product.

Splitting

This operation cuts the leg in half from the top down, producing two equal halves. Note:This is a per part number operation, add as many as needed.

Partial Notch

This process removes one quarter of the post from the top down and stops 4" before reaching the bottom. This can be adjusted to fit your need. Note:This is a per part number operation, add as many as needed.

Electrical Box Notch

Adding a electrical box on the leg or post

Full Length Bore

Needs description here


  • american express
  • diners club
  • discover
  • master
  • paypal
  • visa